Ontario Wind Turbines
Ontario has the most expensive electricity in North America
leading to unaffordable hydro bills, manufacturing leaving, high unemployment and a stagnant economy.
This is the result of over-priced wind power; an industry Ontario doesn’t need and can’t afford.
(Comparing to the other provinces and the continental U.S.)
“Ontario is probably the worst electricity market in the world,”
Pierre-Olivier Pineau, Associate Professor and Electricity Market Expert, University of Montreal HEC Business School.
Ontario’s Energy Policy affects every person in Ontario.
Eleven years ago, Ontario had a vibrant energy sector. It has changed since then.
The following is a summary of the energy policy that is being implemented by the Ontario Government.
All supporting information is under Sources.
Ripley-KincardineRipley-Kincardine, Lake Huron
Over the next 20 years, your household will pay an additional $40,000 for electricity.
The cost of wind power will add $110,000,000,000.00 to our electrical bills.
To appreciate the cost, $100 billion can buy 5,000,000 Honda Civics.
Ontario is building 6736 Wind Turbines.
We already have clean and excess power from water, nuclear and gas.
Bruce Peninsula
We pay more for wind power than any province/state in North America.
We are subsidizing the wind industry.
The Ontario Government pays the wholesale price of 11-13.5 cents per kwh for wind power.
The average retail price for wind power in the U.S. is 7 cents.
The average retail price for Ontario nuclear, water and gas is 7 cents.
Ontario hydro consumers pay for a debt that was actually paid off in 2010.
The 10% clean energy rebate on your hydro bill is charged to Ontario tax payers.
Ontario is the only province/state that charges HST, delivery, and regulatory fees on electricity.
Your hydro rates increase every May and October.
In 2007, you paid 7 cents per kwh.
In 2014, you pay 14-27 cents per kwh, depending on usage and location.
Check your hydro bill; divide the total (including HST, delivery and regulatory fees) by your usage.
1699 kwh costs $210 = 14 cents per kwh.
288 kwh costs $79 = 27 cents per kwh.
Compare our rates to: 6.8 cents in Quebec and 7.9 cents in Manitoba.
Pro-wind groups claim that our expensive electricity is due to expensive nuclear power.
However, the Ontario Power Generation states otherwise as per the link below:
http://www.opg.com/generating-power/nuclear/Pages/nuclear.aspx
Shelburne
Manufacturing is leaving Ontario.
“Ontario has the highest industrial rates in North America.”
Association of Major Power Consumers in Ontario. Refer to Sources for complete report.
Caterpillar (2 plants), United Steel. Heinz, Bicks, International Trucking,
General Motors, Navistar, Kellogg’s, John Deer, Lance Bakeries, Kraft Foods, Unilever.
NOVA Chemicals says the cost of power is critical in its decision to locate a multi-billion-dollar polyethylene expansion in Sarnia Ontario.
Their alternative is the U.S. Gulf Coast where rates are a fraction of ours.
http://www.theglobeandmail.com/report-on-business/economy/ontario-drives-manufacturers-away-with-overpriced-electricity/article14854752/
Since 2006, power usage has decreased by 6%.
Ontario has almost 1 million people out of work.
Ontario’s $227 billion debt is the worst in North America.
“Ontario’s economy has not performed on par with the rest of Canada,
due in part to its slow economic growth and spiralling public debt.”
Fraser Institute, April 2014. Refer to Sources for complete report.
Bruce Peninsula
Gone are the days of beautiful Ontario….
“These wind projects will change this place more totally, more rapidly and more permanently
than anything in the past 10,000 years”
James Corcoran, South Huron, Ontario
30 years experience, environmental assessments on behalf of developers.
The Human & Environmental Impact
To appreciate the full impact of turbines on our people, please find the time to read this:
http://www.southwesternontario.ca/news/public-fills-gallery-to-hear-wind-turbine-concerns/
Wind companies pay proportionally less taxes than the rest of us; turbines are assessed at a fraction of the actual value.
Farmers who sign 20 years leases with Wind Companies also sign a gag order whereby they must promote turbines and cannot criticize.
Wind companies are exempt from many Ontario laws.
Examples: municipal bylaws, building permits, road weight restrictions, proximity to highways, drainage.
Example: The restriction on rural bridges with 1/2 ton limits, where the heaviest load is usually a tractor,
are lifted during the construction of a wind project.
Example: Wind Projects can violate the Labour Act.
These cranes from the Adelaide wind project were left in this position overnight.
cranes
The Ministries of Environment and Natural Resources have changed laws that apply only to wind companies.
Example: there is no protection of wetlands; death or harm to endangered species.
Example: If you destroy an eagle’s nest, the fine is $10,000; whereas wind companies are exempt.
Wind companies routinely sue municipalities/persons who get in their way.
The government supplies lawyers to back a wind company;
but has never backed a municipality, group or person.
Laws were passed where municipalities have no rights regarding wind projects in their jurisdiction.
Over 80 municipalities are “unwilling hosts” to turbines, but are not acknowledged.
Every turbine will permanently destroy 3 acres of land; roughly 21,000 acres of farmland lost forever.
Ontario turbines are closer to humans than any place in the world.
People are suffering from constant turbine noise and wind turbine syndrome which can be life threatening.
People are abandoning their homes at a unprecedented pace; very few want to live in or buy a house surrounded by turbines.
The fortunate ones are bought out by the wind companies, but sign a gag order as to why they left.
Areas in rural Ontario are becoming ghost towns.
The Birds
swans-thedford-bogMarch 2014 – Lambton Shores – Rest area for Migrating Tundra Swans
March 2015 – Lambton Shores – Rest area for newly built wind turbines.
People call turbines bird blenders because they slice, maim and slaughter birds.
Turbines will be built in the paths of the millions of birds that migrate to or through Ontario.
Turbines kill more bats than birds (their lungs explode from the turbine’s drop in air pressure). Don’t neglect the importance of bats to our eco-system.
A Perspective of Turbine Height
Using the Absolute Towers in Mississauga rendered in as a backdrop:
Absolute Towers is 56 storeys.
The small turbine is the CNE turbine – 299 feet high.
The mid-size is the average Ontario turbine – 380 feet high.
The tall one is the new Ontario turbine – 550 feet and taller.
Three
The rendering below provides a perspective of Ontario’s new turbines.
The building behind is 38 storeys.
TheMega
Ontario’s wind energy policy is convoluted and wastes money.
Nuclear, hydro, & gas is clean, cheap and has a 100% reliability, but, wind is given priority to our grid.
Wind power is expensive and unreliable; available 20-30% of the time.
When there is no wind, there is no wind power available.
For every kwh of wind power, we need one kwh of backup, that could otherwise be used as our sole source.
Ontario is spending $11 billion building transmission lines to feed power from every wind project.
That’s an additional $2750 cost to your household
Ontario has too much power and we either, pay the USA & Quebec to get rid of the excess or charge 2.5 per kwh.
In 2013 alone, the loss was $1 billion which will cost your household an additional $250.
Quebec turns around and sells our hydro at 5 cents per kwh to bordering States.
When there is too much power, Ontario pays $1 million dollars a day to take a nuclear plant off-line ($66 million in 2013)
and pays wind companies to shut down their turbines.
$6 billion was spent to increase the power at Niagara Falls; only to divert the water when there is excess power.
Ontario pays gas plants to run as backup for wind power.
The first weekend in August, Ontario lost $10 million because of highly windy days resulting in unexpected power to the grid.
The same occurred on November 9 & 10, where Ontario lost another $20 million.
September 11, 2013: Ontario agreed to pay Wind Energy companies $200,000 per mw not to supply power,
The government says it’s “cheaper than paying the USA & Quebec to use it”.
Since then, new wind projects continue to be approved.
The plan to build two new nuclear reactors at Darlington was abruptly cancelled in October 2013 at a cost of $180 million.
During the 2011 election, the Liberals cancelled the construction of 2 gas plants to win Liberal seats.
These cancellations totaled $1.1 billion which will cost your household an additional $250.
The Lambton coal plant had just been upgraded at a cost of $1 billion to produce clean coal before it was closed in October 2013.
That will cost your household another $250.
Ironically, the Lambton coal plant is 1 km from a coal plant in Michigan that is still active.
“This situation is expected to get much worse over the next several years as significant amounts of wind,
hydraulic and nuclear generation will be coming into service while expected electrical demand will continue
to be stagnant.”
Ontario Society of Professional Engineers. Refer to Sources for complete report
Truth is stranger than fiction
Ontario pays 11-13.5 cents for wind power.
Ontario pays or charges Quebec 2.5 cents take our excess.
The loss is subsidized by Ontario consumers.
Quebec sells it to border States for 5 cents.
Consequently:
Manufacturers can move to the States and get cheap power; where a portion is sourced from Ontario and subsidized by Ontario consumers.
New York State sees an opportunity.
Promotional information was sent to Ontario’s Manufacturing sector citing Ontario’s high energy costs as a good reason to relocate to New York State.http://www.theglobeandmail.com/news/politics/soaring-energy-prices-making-ontario-look-dim-for-manufacturers/article17560172/
Wolfe Island – photo rendering shows pre-turbine days
Wolfe Rendering
Wolfe Island – actual photo
8
The Vulnerability of our Grid
When produced, power has to be used immediately; there’s no technology to store it for a later time.
There is excess power almost every hour of every day, and Ontario scrambles to find a state/province that will take it.
Depending on their power needs at the time, we either give it away (spill it), pay to take it (spill it) or charge a very low rate.
Because wind power is so unpredictable, the IESO staff are continually manipulating the grid; telling the nuclear, gas and hydro suppliers to adjust their output accordingly; and the excess is then sent to Quebec, Manitoba and the States.
According to the Ontario Society of Professional Engineers:
Carbon Dioxide Emissions will increase by 48% in 2030,
because gas plants constantly starting up and shutting down expel more emissions than if they ran continually.
Much of our wind power will go to Quebec and the States.
Wind blows mostly at night and in the winter when we need power the least.
There is no wind on a hot summer day, when our air conditioners need it the most.
Constant changes to the grid are prone to error and Ontario’s grid wasn’t built to handle such.
Be prepared for frequent and long blackouts or worse, as in complete failure of our energy grid.
Chatham-Kent-wind-turbines-from-Lake-Erie-and-Rondeau-Bay15
Rondeau Bay
Ontario has more than enough power with Nuclear, Hydro (water) and Gas.
Ontario’s average demand for power is roughly 18,000 mw.
In the last 8 years, Ontario’s highest demand for power was 27,005 mw on August 1, 2006.
The amount of available power is 30,806 mw which far exceeds the demand.
Nuclear = 12947 mw: Hydro = 7939 mw; Gas = 9920 mw.
The Liberals will have added 3725 mw of installed wind energy by the end of 2014;
with intentions of adding more.
“Ontario will phase in wind, solar and bioenergy
….with 10,700 MW online by 2021.”
Ministry of Energy
(Ontario is offering 44-88 cents per kwh for solar and bioenergy.)
Chatham Kent – photo rendering shows pre-turbine days
chatham kent 1
Chatham Kent – actual photo
chatham-kent-ontario-kruger-energy-port-alma-wind-from-hwy3-talbot-trail-4
Does this make sense to you??
”The province’s wind and solar power initiatives were decided and implemented in such haste
that “no comprehensive business-case evaluation was done to objectively evaluate the impacts
of the billion-dollar commitment.”
Auditor General of Ontario
There are about 50 resident wind lobbyists in Toronto.
The Liberals introduced and passed the Green Energy Act 2009.
The NDP have supported the Liberals on wind energy since its inception.
The PC’s do not support subsidized wind power. They want it stopped.
This has been going on for years. One example:
In 2004, Mike Crawley, the (then) President for the Ontario Liberals,
was awarded a wind power contract that guarantees his company $66,000 a day for a total of $1/2 Billion dollars.
Since then, Mike Crawley continues to build additional Wind Projects.
The Wind Industry held a fundraising event for Kathleen Wynne in April 2013.
Those who promote Wind power, benefit financially by doing so.
David Suzuki, Pembina Institute, Cleantech, MaRs, Environmental Defence,
Friends of the Wind, Windfacts and CANWEA.
A wind company is getting a pass on violating the law?
In the Niagara region, four turbines that were built too close to residents, are violating the law and need to be dismantled.
The Minister of Energy has done nothing.
http://www.niagarathisweek.com/news-story/4390620-enforce-the-law-hudak-to-energy-minister
Lake Ontario – photo rendering shows pre-turbine days
sail copy
Lake Ontario – actual photosail
Every project could be stopped today; if the Liberals want to.
The Ontario Government has the discretionary power to cancel or modify these contracts but it’s clear they don’t want to.
An Ontario court ruling in the decision of Trillium vs. Ontario, 2013, clearly states that:
“Governments are free to alter policies in the public interest.”
“Companies in the renewable power business participate in government subsidy programs ‘at their own risk’.”
As of March, 2014, the Liberals are continuing with the 55 incomplete wind power projects (about 4900 turbines) that could be stopped legally.
“If you are asking me, will you cancel those [wind project] contracts outright? The answer is no we won’t!”
Kathleen Wynne, in Kincardine, April 24, 2014
For ruling, refer to Discussion at the bottom of this page
http://www.osler.com/NewsResources/Appeal-Court-Allows-2-Billion-Wind-Farm-Action-to-Proceed-Against-Government-of-Ontario/
Chatham Kent Airport
Chatham Kent Airport – Location of turbines was denied by Transport Canada,
fought by the municipality, but approved by the Ontario Government.
The same is happening in Collingwood, Peterborough, Goderich, Kincardine, Huron Park, Grand Bend and the Niagara Region.
The sky-diving club in Niagara Region will have to shut down.
Energy Platform by Party
The PC’s introduced Bill 42 in 2012 and Bill 39 in 2013 to eliminate wind subsidies and give control back to municipalities.
The NDP’s and Liberals voted against these bills. Refer to Sources.
Liberal
Will be pursuing additional wind power projects in 2015 and again in 2016.
Remove the Ontario Hydro Debt charge on January 1, 2016. (About $60 a year decrease in costs).
Discontinue the Clean Energy Rebate on December 31, 2015. (About $170 a year increase in costs).
Introduce a surcharge for families making over $40,000, to subsidize lower income families.
NDP
Committed to “aggressively expand renewable energy”.
Honour existing green energy contracts
Place a moratorium on all renewable power projects starting in 2018.
Progressive Conservatives
Scrap Ontario’s wind energy policy.
Give control back to municipalities.
Put a moratorium on wind energy projects.
Eliminate wind subsidies, which would substantially reduce our hydro bills.
“We propose scrapping the Green Energy Act and implementing an immediate moratorium
on industrial wind turbines until the jury is in on health and environmental studies.
We will not sign any more FIT contracts and will take a look at the existing ones.”
PC MPP Toby Barrett, April 2, 2014
Wolfe Island121
Wolfe Island before & after the Liberal’s energy policies
Is Nothing Sacred?
Temple_Rendering___Content
Near Peterborough, a $40 million project to build the largest Buddhist complex outside of China is in jeopardy.
The Liberals knowingly approved wind turbines to surround the complex.
The people in charge of the development say these turbines will have a negative impact on the serenity of the complex.
This complex would have attracted about 45,000 visitors a year and generated more than $20 million for Ontario.
Wind Farms slated for Ontario
Click here to see maps of these projects
Rondeau Bay – photo rendering showing pre-turbine days
Rondeau Bay Rendering
Rondeau Bay – Actual photo
chatham-kent-ontario-internaional-power-gdf-suez-from-across-rondeau-bay-from-erieau-2
Wind verses Nuclear
Nuclear power costs 6.8 cents per kwh, period.
Wind power costs 11-13.5 cents per kwh, plus all other costs mentioned above.
One wind project approved for the area east of Grand Bend is approximately 34 km long and 16 km wide.
The nuclear footprint is 9 sq. kilometers.
It will have 63 wind turbines with a maximum output of 102 mwh.
Applying efficiency factor of 30%, actual output will be 30 mwh.
Ontario average usage is 18,000 mwh.
Nuclear can provide approximately 12,947 mwh 24/7.
This wind project has the potential of providing .16% (1/6th of one percent) our energy needs.
When there is no wind, it will provide 0% of our energy needs.
Map
tmap
In 10-20 years
The Niagara Falls hydro generating stations are 100 years old, but wind turbines are good for only 10-20 years.
Each turbine construction consists of 800 tonnes of cement for support, approximately 250 tonnes of unrecyclable materials, 700 litres of hydraulic fuel and, 600 kilograms of rare earth metals. Multiply these numbers by 6736 and Ontario is facing a potential ecological conundrum.
The are no bonds posted to ensure these turbines will be dismantled at the end of their life cycle. It is estimated that a turbine, depending on size, will cost $400,000 to $1,000,000 to dismantle.
Given that wind companies are predominantly foreign, change ownership or, go bankrupt, it is quite realistic to expect 100′s or 1,000′s of dead turbines in 20 years and left standing.
This is happening already. Wind Companies usually don’t fix or dismantle broken turbines and, Ontario already has many non-functioning turbines.
If companies won’t dismantle a couple of turbines now; what about the future ones?.
The Liberals have no plans as to where to dispose these materials, nor have indicated that wind companies will be responsible for the costs of building the landfill sites or depots.
One can only assume, that the cost to dispose 6736 turbines will be covered by the people of Ontario.
In 10-20 years, we could be faced with a landscape of old, rusted out, broken down turbines.
The Canadian Taxpayers Federation:
Launched a petition to dismantle the Liberal Green Energy Act.
https://www.taxpayer.com/resource-centre/petitions/petition?tpContentId=84