Moyne Shire Council Rubberstamps AGL’s Macarthur Wind Farm Noisewash
The nightmare that is AGL’s Macarthur wind farm began operating in October 2012 – the first 30 fired up then. All 140 giant 3MW Vestas V112s kicked into gear in about February 2013.
Ever since, the locals have been driven absolutely insane with incessant low-frequency noise and infra-sound.
AGL (aka “Australia’s Greatest Liars”) have been running interference in relation to noise problems from the very start.
The incompetent bunch of goons that they hired to do the acoustic work lost and fudged data and, when challenged about data that went missing, blamed flat batteries more than once.
Macarthur residents hired their own careful, independent acoustic engineers to do proper methodical studies into noise impacts, which included full spectrum testing – something that AGL and its pet acoustic consultants have not done and will never do. The low-frequency testing done by AGL used the same method discredited by Steve Cooper a while back.
STT has seen the work done by the locals’ acoustic experts and – without a shadow of a doubt – it demonstrates that the noise levels generated do not and will never satisfy the noise conditions of AGL’s planning consent.
Now AGL have managed to get the Moyne Shire Council to rubber-stamp its acoustic white-wash in order to allow it to claim compliance with the noise conditions of its planning consent. But the lawyers for the Council – as well as the outfit charged with reviewing AGL’s noise report – had trouble working out what the “vague” and “unduly complicated … wording of the planning permit” actually meant, so advised that the best way to determine compliance was with a vote on it, according to the Council’s Agenda:
As Maddocks have advised, (Confidential Attachment 6) the noise compliance issue for the Macarthur Wind Farm has been unduly complicated by the wording of the planning permit. For example, the permit wording is so vague it is unclear whether Council is required to make a resolution regarding noise compliance. However in order to be transparent and to act in the most appropriate manner as the responsible authority, Maddocks recommends to Council that a resolution is the best means of addressing the noise compliance issue.
There. Isn’t it so much simpler when sticky situations that might see a wind farm operator called to account are settled on a show of hands. Settled that is, by people who aren’t acoustic experts and don’t, apparently, even know what the terms of the noise conditions they’re meant to be applying mean (their lawyers didn’t). And, instead of being “transparent”, the Council kept the correspondence from its lawyers pointing out that the conditions were “unduly complicated” and “vague” confidential (Attachment 6). So much for open and transparent government.
When it came to the Council meeting AGL didn’t have it all its own way. Former Mayor, Councillor Jim Doukas ripped into AGL and gave his fellow members a right-royal-rocket for their complicity in allowing AGL to operate with impunity.
Moyne councillor slams Macarthur wind farm noise review
The Standard
Anthony Brady
25 September 2014
A MOYNE Shire Councillor has hit out at the operators of the huge Macarthur wind farm, saying they should be “tied to a tree and flogged with a whip”.
In a fiery address to the council’s meeting on Tuesday night, Cr Jim Doukas refused to accept a peer review commissioned by the shire which found company AGL was operating the 140-turbine wind farm within noise guidelines.
“It is the biggest load of garbage I’ve ever read in my life and AGL should be tied to a tree and flogged with a whip,” Cr Doukas said.
He said the noise readings taken by AGL’s consultants were “insignificant” and “outside the guidelines” and questioned how a peer reviewer could find them compliant.
“For anyone who reads this and says this is a fair and honest report is just not right and should be ashamed. “We as a council should not make the determination on the report here tonight. We haven’t gone out to the public.
“No one in Australia who is involved in the wind energy industry, whether they support it or not, has had the chance to look at this and make comment and I think there are wiser heads out there than ours.
“As for those who are objectors, they are entitled to make comment and address council on the issue.
“If we support this tonight we deny them their right and I don’t think that’s right. We are shoving it down their throats and forgetting about the community and, for me, that’s just not on.”
But Cr Mick Wolfe disagreed with the outburst, saying people had already had a chance to comment.
“It’s time for this to go through. We’ve got our report and it’s been reviewed, the facts are in there,” Cr Wolfe said.
“We’ve heard from others alleging corruption, fraud, failure — you name it.
“Everything that AGL or the testers try to do that’s not in favour of the opponents they slam them with some pretty serious allegations.
“They (the opponents) have had a chance to come to any council meeting and show us their data.
“They are hiding it, they are holding it and not releasing it and I don’t know why. Come forward with it.”
The council agreed with the report’s findings that the wind farm is complying with noise levels, but has called for further monitoring within 12 months.
This follows advice from the peer reviewer that noise emissions can change over time as faults develop within the turbines and parts need replacing.
A spokeswoman for AGL yesterday welcomed the council’s confirmation of the report.
She said AGL had already carried out more than 40,000 hours of noise monitoring at Macarthur which was “well beyond” the level required under the shire’s planning permit.
The Standard
Compliant or not, the suffering caused by AGL’s turbines is real; and was documented by STT Champion, Anne Schafer in a community survey. Here’s a link to the survey. And see our post here.
One of AGL’s numerous victims, STT Champion Annie Gardner wrote this cracking letter to the Editor of The Standard – praising Jim Doukas for doing his job; and slamming the goats that pass for local government representatives for failing to do theirs.
To the Editor,
The affected residents of this district are extremely grateful for the unconditional support given by Councillor Jim Doukas (“Moyne Councillor slams Macarthur wind farm noise review 25.9).
Unfortunately the same cannot be said of the remainder of Moyne Shire Council who have been elected with a duty of care to protect the health of ALL residents.
Moyne Shire Council are in receipt of hundreds of health complaints as a result of the acoustic emissions from the turbines at the Macarthur wind farm, but have done NOTHING to protect us from this serious harm to our bodies.
As Councillor Doukas rightly claims, we have been denied our right to comment on the noise peer review. I have requested on several occasions to have a copy of this peer review forwarded to me, but these requests have been constantly denied by a council withholding information.
Councillor Wolfe shows his ignorance when he claims residents have had plenty of time to address council and hand over our noise data. It is not that simple, as any lay person isn’t able to comprehend acoustic data, and I doubt any councillors would be trained in acoustics.
Just prior to the council meeting on Tuesday, when Moyne Shire finally released the peer review report, I requested Council forward to our independent acoustic expert, all documentation relating to the peer review, in order that he may compile a report to immediately present to Council. This report, with additional damning evidence, will prove that the Macarthur Wind Farm is NOT COMPLIANT with government noise guidelines.
I also requested Council defer confirming compliance of the wind farm, until our acoustic expert is able to present his report to the Council. This request was obviously ignored.
In the name of openness and transparency, surely Moyne Council could have waited to read the resident’s acoustic expert report which will surely blow any claim of compliance of the Macarthur wind farm, out of the water.
We ask Moyne Shire, WHERE HAS DEMOCRACY GONE?
ANN and ANDREW GARDNER
PENSHURST, Victoria


