Great News! Useless Wind Turbines May Soon Kill the Wind Industry!

Faulty Turbines Sending Siemen’s Wind Power Division Broke as Samsung Cuts & Runs from Europe

siemens-turbines

German fan maker, Siemens has been running a huge propagandacampaign in South Australia over the last couple of weeks, surrounding the opening of the extension of the Snowtown wind farm – wheeling in Australia’s 2011 Tour de France winner, Cadel Evans as their pet-pedal-powered mascot.

And its highly paid wind farm ambassador, Tim Flannery – Australia’s world-renowned (but self-appointed) long-range weather forecaster – has been on the front foot in the press in recent weeks screaming about imminent “global incineration”. Tim’s “solution”? Why more giant (Siemens) fans, of course!

Not that he makes much noise about it, but Tim sits on Siemen’s Sustainability Advisory Board and – true to the title – has been working flat-out to “sustain” Siemen’s ability to flog its fans in Australia – with a mix of hysterical hectoring and overweening political pressure – all built around the mystical ability of wind turbines to suck CO2 out of the sky and drop world temperatures on a made-to-measure basis. A bit like a heavenly thermostat, apparently.

Although, being a loyal and faithful servant of his German masters, Tim hasn’t limited himself to just being Siemen’s top fan salesman. Oh no – Siemens is in the Carbon Capture & Storage business – so Tim took tospruiking the merits of CCS as only a recent “covert” could.

This little “switcheroo” required Tim to bury his hitherto well-publicised revulsion to coal:

Interviewed in 2007, he likened the coal industry – which employs thousands of Australians and provides the vast majority of our cheap power generation – to those that had sold asbestos. He also argued their ‘social license to operate’ should be withdrawn. A year before, he wrote that ‘the old coal clunkers need to be closed as quickly as possible’ and proposed that they be replaced with hitherto unproven technologies like geothermal and wave energy (see this article for more).

One thing’s for sure, this boy knows how to sing for his supper!

Tim – an expert on extinct giant Australian marsupials – and obviously the first person you’d call when it came to water management issues – predicted right throughout one of Australia’s frequent, prolonged droughts – that it would be “hotter and drier forever”.

flummery

Check out his doomsday interview with Maxine McKew in 2005 – here – a classic example of how being wedded to a delusional belief in “Catastrophic Global Warming” overtakes history and science all in one breath.   He kept that rubbish up – right until the floods started inQueensland in December 2010 –  a totally normal La Nina related flooding event – preceding the three wettest years (on average) recorded since white settlement. In 2013, Adelaide – in the driest State – recorded one of its wettest Julys ever. Onya Tim!

If it was just a bit of good-ol-fashioned shamanism, you might forgive Tim for his over-blown rantings – but his doomsday drought prophecies came with a multi-$billion price-tag. Tim warned that Australian cities would all die of thirst: the “solution”? Massive desalination plants for Brisbane, Melbourne, Sydney, Perth and Adelaide (all bar Perth’s were mothballed, no sooner than the concrete had set). Thanks Tim!

But this wasn’t all wasted effort on Tim’s part. Oh no, through his “it’s desal or death” mantra Tim was able to help “sustain” Siemens – itbagged a very big slice of the desal plant action.

But Tim may need to think about where his next meal is coming from, as his paymaster’s wind power division hits the wall. Not only did Siemens find itself in huge strife being convicted of bribery and corruption – leading to hundreds of $millions in fines (see our post here) – its wind turbine arm is losing money hand-over-fist. The problem?: Siemens turbines are suffering catastrophic bearing and blade failures, requiring urgent, wholesale replacements. Here’s Reuters setting out a little of Siemen’s escalating financial woes.

Turbine faults cost Siemens €223million
Wind Power Monthly
Patrick Smith
6 November 2014

GERMANY: Costs related to faulty wind turbines have hit Siemens’ results, forcing the wind division into a loss for both the fourth quarter and 2014.

The German manufacturer said it was impacted by EUR 223 million in charges for inspecting and replacing main bearings in onshore turbines, as well as repairing blades on both onshore and offshore turbines.

Head of the Siemens energy business Lisa Davis said: “The charge is related to inspecting and replacing bearings due to the early degredation in certain turbine models. We believe this is related to recent batches of bearings and we are in discussions with the supplier.”

She said that the blade degredation was due to “harsh weather conditions both onshore and offshore”. She added that Siemens has “implemented a design change for leading edge protection” for new blades and will be implementing a “similar retrofit” for existing blades.

These faults resulted in a loss for the wind division of EUR 66 million in the quarter to the end of September. This compares with a profit of EUR 179 million a year before. Revenue remained steady at EUR 1.62 billion.

For the year, the division made a loss of EUR 15 billion, compared to a profit of EUR 306 billion despite a 6% increase in revenue to EUR 5.5 billion.

Siemens has previously had issues with faulty blades and bearings. Blade breakages on a number of onshore turbines last year caused the curtailment of 700 turbines worldwide. And in 2010, the company was forced to carry out maintenance work on four offshore wind farms after it was discovered the bearings in the 3.6MW turbines’ were corroding.

In addition to the write down due to turbine faults in the latest quarter, the wind division’s performance was adversely affected by a lower profit contribution from the higher margin offshore business. The division’s margin slumped from 11.1% to negative 4% in the latest quarter.
Wind Power Monthly

One of the wilder claims made by the wind industry and its parasites is that wind power production costs will inevitably fall (sometime over the next space-time-continuum, apparently) – some fantasists even go so far as to claim that wind power is already cheaper to deliver than coal and gas-fired power – as to which, see our post here.

However, the fact that Siemen’s turbines – barely out of the factory – need wholesale bearing and blade replacement doesn’t bode well for claims that wind power production costs fall over time: a line that’s proved to be nothing more than hot air – as blades continue to fracture; and bearings, generators and gearboxes wear out twice as fast as predicted (see our post here). And more and more turbines spontaneously combust (see our post here). The cost of replacement is phenomenal (see our post here).

Bearings: The Achilles Heel of Wind Turbines
wattsupwiththat.com
Eric Worrall
26 August 2014

A few years ago, I used to know a senior wind turbine engineer. One evening, over a few beers, he told me the dirty secret of his profession:

“The problem is the bearings. If we make the bearings bigger, the bearings last longer, but making the bearings larger increases friction, which kills turbine efficiency. But we can’t keep using the current bearings – replacing them is sending us broke. What we need is a quantum leap in bearing technology – bearing materials which are at least ten times tougher than current materials.”

At the time there was very little corroborating online material available to support this intriguing comment – but evidence seems to be accumulating that bearings are a serious problem for the wind industry.

Siemens citing bearing failures as part of the reason for a substantial fall in profit:
http://www.offshorewind.biz/2014/05/07/siemens-energy-division-profit-down-54-pct/

In the announcement of the opening of a new Siemens research facility:
http://www.greenoptimistic.com/2013/03/19/siemens-wind-turbine-research/
“… The Brande test center would evaluate the main parts of their wind turbines such as main bearings …”

http://www.geartechnology.com/newsletter/0112/drives.htm (an attempt to make direct drive turbines, to reduce bearing wear) “… More accurately, it is typically the bearings within the gearbox that fail, in turn gumming up the gearbox, but that’s a story for another time. …”

http://en.wikipedia.org/wiki/Burbo_Bank_Offshore_Wind_Farm
“… During summer 2010 Siemens decided to change the blade bearings on all 25 turbines as a pre-emptive measure after corrosion was found in blade bearings found on other sites. …”

Of course, there is the occasional video of catastrophic turbine failure:

And suggestions that the industry is trying to conceal the scale of the turbine fire problem:

http://www.dailymail.co.uk/news/article-2695266/Wind-turbine-fire-risk-Number-catch-alight-year-ten-times-higher-industry-admits.html

All of which creates an interesting question – just how much of our money is the government prepared to waste, to keep their wind dream afloat? If the costs are far greater than the industry admits, how long is the wind industry going to carry that additional hidden cost, before they try to push the costs onto taxpayers, or abandon wind technology altogether?:

http://www.dailymail.co.uk/news/article-2116877/Is-future-Britains-wind-rush.html

Wattsupwiththat.com

runaway train lone ranger

Meanwhile, in yet another sign the walls are falling off of the wind industry’s gravy train, Korean fan maker, Samsung has pulled the plug on its European operations; and appears set to abandon major projects on its home turf.

Samsung winds down European wind activities
Wind Power Monthly
Patrick Smith
16 October

SOUTH KOREA: Samsung Heavy Industries (SHI) has shut two of its wind energy offices in Europe and is downsizing its wind business in Korea.

A spokesperson confirmed that SHI has shut down wind activities at its Hamburg and London offices, but denied that the company was pulling out of wind altogether.

“We are now downsizing the [wind] business based on our new strategy. It has not been closed down,” she said. The company refused to comment further.

A source within the company said that SHI would still explore opportunities in Europe, but was unable to define what those activities would be.

Windpower Monthly reported in June that SHI was initiating a review of its offshore activities in Europe.

The London office had been the base for the marketing of the 7MW offshore turbine, a prototype of which started operating in Scotland earlier this year. SHI said that the ship building division would continue to operate out of the London office.

While the spokesperson said that the offshore project is still alive, she was unable to point to any activity concerning plans to take the turbine into production.

Windpower Monthly spoke to a number of Korean employees that had been moved from their previous positions in the wind division to roles in the shipbuilding business.

Several employees said that SHI was winding down the division entirely, but the company said that this is merely a “rumour”.

The fate of the 7MW prototype at the Fife Energy Park in Scotland is unclear. A spokesperson for Fife council, which is running the project in conjunction with Scottish Enterprise, said that activities are continuing to certify the turbine. SHI said it is still operating an office at the energy park.

SHI also had plans to construct the 84MW Daejeong offshore wind project in South Korea, but it is not known whether it will go ahead with the development.
Wind Power Monthly

dirtyrottenscoundrelsoriginal

Open letter….Reaching Out to the Federal Government, for Help!

The Right Honourable Stephen Harper

Prime Minister of Canada

pm@pm.gc.ca

The Honourable Peter Gordon MacKay

Minister of Justice and Attorney General

mcu@justice.gc.ca

The Honourable Rona Ambrose

Minister of Health

Health Canada

minister_ministre@hc-sc.gc.ca

Copy:

Gregory Taylor, BSc, MD, CCFP, FRCPC

Deputy Chief Public Health Officer

Public Health Agency of Canada

Gregory.Taylor@phac-aspc.gc.ca

Sarah Rudolph

Child Rights and International

Division of Children, Seniors and Healthy

Public Health Agency of Canada

sarah.rudolph@phac-aspc.gc.ca

Ms Cheryl Gallant

MP Renfrew-Nipissing-Pembroke

cheryl.gallant.a1@parl.gc.ca

Ms Shellie Correira

Mother of a child at risk

shelliecorreia@gmail.com

May 5, 2014

Dear Prime Minister Harper and Ministers of Justice and Health,

Re: Open Letter on the UN Rights of the Child and Industrial Wind Energy

The purpose of this letter is to request a meeting with members from the Ministries of Justice and Health including the Public Health Agency of Canada as soon as possible to discuss protection of children at risk from exposure to industrial wind energy facilities.

I have corresponded with several Ministers including those from Health Canada, Public Health Agency of Canada, Justice and Attorney General regarding my concerns associated with wind energy development and children’s risk factors and Canada’s ratification in 1991, of the treaty on the Rights of the Child.

I was advised that Canada’s domestic implementation of its obligations under the Rights of the Child Convention is multi-faceted and includes “constitutional protections under the Canadian Charter of Rights and Freedoms and a variety of legislation, policies, programs and services at the federal and provincial/territorial levels.”

As well, I was informed the legislative implementation of the Convention falls under the

purview of the Department of Justice Canada. [Correspondence attached]

Attached is a submission provided to the Minister, Health Canada regarding the vulnerability of children to the effects of noise in general, and including risk factors specific to industrial wind turbines. [Health Canada_Risks to children December 27 2012 FINAL]

Another submission was made on behalf of Ms Shellie Correira. Attached is a copy of this submission plus the treating physician specialist’s opinion regarding her son’s risk from exposure to wind turbines. [Health Canada_Risks to children Correia May 15 2013]

Other submissions have been made on behalf of parents and communities which express parental concerns. These are available on request.

A review by Jan et al (2010) states:

“Animal experiments unequivocally show that sleep loss even for three or four days can adversely and permanently affect neurophysiological functions and neurogenesis.

This review summarises the increasing evidence … that chronic disturbances of sleep adversely affect brain development … Pediatric neurologists, the scientific community and the public must be aware of these recent scientific developments. Further studies are urgently required.” [Jan JE, Review article, Long-term sleep disturbances in children: A cause of neuronal loss. European Journal of Paediatric Neurology 14 (2010) 380-390]

The World Health Organization (WHO) acknowledges that noise is an “underestimated threat that can cause a number of short- and long-term health problems…” [World Health Organization Noise Facts and Figures, Sited December 23, 2012, http://www.euro.who.int/en/what-we-do/health-topics/environment-and-health/noise/facts-and-figures ]

Research indicates children’s ear damage, cognitive function and learning are affected by noise and there could be lifelong effects on academic achievement and health. Excerpts from The World Health Organization’s Training Package for the Health Sector on Children and Noise identify vulnerable groups of children at risk including the fetus and babies; preterm; children with dyslexia and hyperactivity. [World Health Organization, Children and Noise, Children’s Health and the Environment, WHO Training Package for the Health Sector, www.who.int/ceh ]

Children with pre-existing medical conditions such as autism, asthma, migraine, bronchitis, and epilepsy can be vulnerable to the effects of noise and/or stress and/or sleep disturbance. [See references below*]

There is a risk of noise-induced harm to children when industrial wind turbine facilities are sited in close proximity to family homes and schools.

I note that Canada played an instrumental role in drafting and promoting the United Nations

Convention on the Rights of the Child. As a proud Canadian, I applaud this achievement.

Ms Correira and I look forward to the opportunity to meet with representatives from the Ministries of Justice and Health including the Public Health Agency of Canada as soon as possible to discuss protection of children at risk from exposure to industrial wind energy facilities.

Respectfully submitted on behalf of Ms Shellie Correira and other concerned parents and family members,

Carmen Krogh, BScPharm

1183 Cormac Road, RR4

Killaloe, ON, K0J 2A0

Cell 613 312 9663

 

Attachments:

Open Letter on the UN Rights of the Child and Industrial Wind Energy

Correspondence attached

Health Canada_Risks to children December 27 2012 FINAL

Health Canada_Risks to children Correia May 15 2013

Letter Physician Specialist

* Citations provided:

1] Cristina Becchio, Morena Mari, Umberto Castiello, (2010). Perception of Shadows in Children with Autism Spectrum Disorders PLoS ONE | May 2010 | Volume 5 | Issue 5 | e10582. Retrieved from  www.plosone.org

[2] Catherine Purple Cherry and Lauren Underwood. The ideal home for the autistic child: physiological rationale for design strategies. Autism Science Digest: The Journal Of Autismone, Issue 03 Retrieved from  www.purplecherry.com.

[3] Flavia Cortesi, Flavia Giannotti, Anna Ivanenko, Kyle Johnson (2010). Sleep in children with autistic spectrum disorder, Sleep Medicine 11 (2010) 659–664 Retrieved from www.elsevier.com/locate/sleep

[4] Hartmut Ising, Martin Ising (2002), Chronic cortisol increases in the first half of the night caused by road traffic noise. Noise and Health 2002,4:16:p13-21 Retrieved fromhttp://www.noiseandhealth.org/article.asp?issn=1463-1741;year=2002;volume=4;issue=16;spage=13;epage=21;aulast=Ising

[5] Bockelbrink A, Willich SN, Dirzus I, Reich A, Lau S, Wahn U, Keil T. (2008) Environmental noise and asthma in children: sex specific differences  J Asthma. 2008 Nov;45(9):770-3. Retrieved from http://www.ncbi.nlm.nih.gov/pubmed/18972293

[6] Neut D, Fily A, Cuvellier JC, Vallée L (2011),. The prevalence of triggers in paediatric migraine: a questionnaire study in 102 children and adolescents. J Headache Pain. 2011 Nov 1. [Epub ahead of print] Retrieved from http://www.ncbi.nlm.nih.gov/pubmed/22042255

[7] Doreen Wagner, Velitchko Manahilov, Gunter Loffler, Gael E. Gordon, and Gordon N. Dutton, Visual Noise Selectively Degrades Vision in Migraine Investigative Ophthalmology & Visual Science, April 2010, Vol. 51, No. 4 Retrieved from http://www.iovs.org/content/51/4/2294.full.pdf

[8] Ising H, Lange-Asschenfeldt H, Moriske HJ, Born J, Eilts M., Low frequency noise and stress: bronchitis and cortisol in children, Noise Health. 2004 Apr-Jun;6(23):21-8

[9] Gilboa T.Epilepsia. 2011 Dec 9. Emotional stress-induced seizures: Another reflex epilepsy? doi: 10.1111/j.1528-1167.2011.03342.x. [Epub ahead of print] Retrieved fromhttp://www.ncbi.nlm.nih.gov/pubmed/22150553

[10] Epilepsy Facts – Epilepsy Canada Cited March 2012, Retrieved from   www. epilepsy@epilepsy.ca

[11] Hartmut Ising, Martin Ising (2002), Chronic cortisol increases in the first half of the night caused by road traffic noise. Noise and Health 2002,4:16:p13-21 Retrieved fromhttp://www.noiseandhealth.org/article.asp?issn=1463-1741;year=2002;volume=4;issue=16;spage=13;epage=21;aulast=Ising

[12] Neut D, Fily A, Cuvellier JC, Vallée L. The prevalence of triggers in paediatric migraine: a questionnaire study in 102 children and adolescents. J Headache Pain. 2011 Nov 1. [Epub ahead of print] http://www.ncbi.nlm.nih.gov/pubmed/22042255

8 Attachments

Preview attachment Health Canada_Risks to children Correia May 15 2013.pdf

Health Canada_Risks to children Correia May 15 2013.pdf

Preview attachment Health Canada_Risks to children December 27 2012 FINAL.pdf

Health Canada_Risks to children December 27 2012 FINAL.pdf

Preview attachment Sprecialist Dr. Calvert’s letter.pdf

Sprecialist Dr. Calvert’s letter.pdf

Preview attachment Letter Rights of the Child May 5 2014.pdf

Letter Rights of the Child May 5 2014.pdf

Preview attachment Response Public Health Agency of Canada April 17 2014.pdf

Response Public Health Agency of Canada April 17 2014.pdf

Preview attachment Correspondance Feb 10 2014.pdf

Correspondance Feb 10 2014.pdf

Preview attachment Response Sept 22 2014 Risk to children IWT.pdf

Response Sept 22 2014 Risk to children IWT.pdf

Preview attachment Krogh_risk factors to children_industrial wind energy_Nov 5 2014.pdf

Krogh_risk factors to children_industrial wind energy_Nov 5 2014.pdf

Once Again….I have reached out to the Gov’t, to help My Son, and all Children!

November 10, 2014

The Right Honourable Stephen Harper

Prime Minister of Canada

Dear Prime Minster Harper,

I am writing to you, as supporter and friend of the

Conservative party. I am hoping that you will be able to intervene to help protect

all Canadians from intrusive health damaging  noise from industrial wind projects.

As you know, I have a personal interest in this issue. The large Niagara wind

project near my home has just received approval. It is no coincidence that its

approval was announced immediately after Health Canada Issued its flawed,

fraudulent report which claims it’s research sows that “there are no health

problems” from wind turbines

.

This Health Canada report was funded to the tune of $2.1 million from the

Canadian taxpayers, and therefore as Prime Minster, you are ultimately

responsible for it, and the consequences which flow from it’s use in Canada.

It is inevitable that many MORE Canadians will be harmed from wind turbine

noise as result of this study which has been widely criticized for adopting

methodology designed to hide and deny the health problems, rather than

properly investigate them. It is telling that

x   Health Canada ignored the advice of professionals with expertise in this

are who are independent of the wind industry

x   Health Canada used various parties who have conflicts of interest

including commercial conflicts of interest with the wind industry, and did

not disclose them

x   Health Canada issued the report without the date, making it impossible for

others with extensive experience working directly in this area, to critique it

properly

x   The report gives very appearance of being “made to order” by the wind

industry and delivered by our government, in order to be able to continue

to knowingly harm vulnerable Canadian citizens, by pretending “there is

no problem”

With respect other project just approved near my home, the closest wind turbine

would be 550M from the center of our home. The wind developer has admitted

that it would be producing noise, at the maximum allowable levels. These

decibel levels were arbitrarily established, and only with healthy brains, in mind.

There is no evidence to demonstrate that the current levels of noise pollution

from wind turbines in Ontario are safe, and there are Ministry of Environment

Field Officers who have admitted these levels are not safe. No consideration has

been given to individuals, who suffer from sensory processing issues, such as

my son, Joey.

Joey’s specialist wrote a letter for me to share, which is enclosed, explaining that

the noise from a  wind turbine in close proximity our home would be very

harmful, for my son. The cyclical, and uncontrollable nature of wind turbine noise

is especially unbearable.

I also have realized, during my struggles with the Provincial government, and

their many branches, that there has been nothing put in place to protect anyone,

regardless of what problems may arise, as result of the industrial wind projects

being forced into areas where they are not appropriate. I have met, and spoken

personally, to Premier Wynne, Minister Chiarelli, Agatha Garcia ­Wright, from the

M.O. E., and many more gov’t branches, trying to get some sort of assistance,

in finding a solution to my problems, but to no avail. Getting help Federally, is my

only option, at this point, because the only suggestion they would give me, is

“get a lawyer”. Unfortunately, I live in Ontario, and we are struggling to pay our

ever­ growing electricity bills, on top of sky­rocketing prices for the basics that

families need. Paying fora lawyer is not something many families can afford,

and the Liberal government knows that.

As you can see, I desperately need help to protect my son. The recent Health

Study was woefully incomplete, and did not even mention children, or any type of

special needs individuals. Indeed children were explicitly excluded.

Please help us find a solution to this very serious problem – for Joey, as well as

for ALL Canadians.This Health Canada Report, needs to be withdrawn, and

immediately subjected to rigorous peer review, with all of the data made public

immediately, to professionals and researchers with expertise in this area.

Reviews of all the possible conflicts of interest of all involved with this report, need

to be conducted, and made public.

A failure to take these steps, and to allow the Health Canada study to escape

proper critical scrutiny and peer review could eventually lead to charges of public

officials being complicit with torture occurring, given the widespread occurrence

of serious prolonged sleep deprivation alone, That, along with all the other health

problems residents are experiencing and health practicioners such as Joey’s

paediatrician are warning about. Such possible legal action against public

officials is being seriously considered internationally.

Sincerely,

Shellie Correia, Founder and Director,

Mothers Against wind Turbines

Wind Project Gets Go-Ahead….In Spite of Objections….

Province gives greenlight to wind farm Niagara region Wind Corp’s turbines to be largest in North America

Credit:  Grimsby Lincoln News | November 06, 2014

The Province has given the go ahead for a 77-turbine wind energy project in Niagara and Haldimand.

The Ministry of the Environment has issued a Renewable Energy Approval to Niagara Region Wind Corporation to construct a wind farm within the Townships of West Lincoln and Wainfleet, and the Town of Lincoln in the Region of Niagara and Haldimand County.

The facility is known as the Niagara Region Wind Farm.

As a result of comments received by the municipality and local residents a condition of the approval requires Niagara Region Wind Corporation to:

•   not construct or operate more than seventy-seven out of the eighty wind turbine generators identified in the approval

•   comply with the ministry’s noise emission limits at all times

•   carry out an acoustic emission audit of the sound levels produced by the operation of the equipment at five receptors

•   carry out an acoustic emission audit of the acoustic emissions produced by the operation of two of the wind turbine generators

•   manage stormwater, and control sediment and erosion during and post construction

•   develop and implement a pre- and post-construction ground water monitoring program

•   carry out specific items if foundation dewatering or water takings by tanker exceed 50,000 L/day

•   apply the Department of Fisheries and Oceans Operational Statement, if during construction, waterbodies that were previously not identified are discovered

•   design, construct and operate a spill containment facility for each of the Transformer Substations

•   implement the pre and post construction Natural Heritage monitoring program, which includes bird and bat monitoring

•   undertake the supplementary monitoring program discussed with Environment Canada and determine next steps as part of the program including the implementation of mitigation measures in response to any potential unanticipated adverse effects

•   ensure that activities requiring authorizations under the Endangered Species Act are not commenced until authorizations are in place

•   create a Community Liaison Committee with members of the public and applicant

•   undertake ongoing Aboriginal consultation and fulfill all commitments made by it

•   prepare a Traffic Management Plan to be provided to the upper and lower tier municipalities, and

•   notify the ministry of complaints received alleging adverse effect caused by the construction, installation, operation, use or retirement of the facility.

 A release by the Province stated that Ontario’s Renewable Energy Approval process ensures that extensive municipal, Aboriginal and public consultation takes place. All comments the ministry received regarding the project were carefully considered before a decision was made to approve this project. The approval notice is posted on the Environmental Registry and a link can be found here:

A Group of Moscow Scientists Picking Up, Where Tesla Left Off. Useful Green Energy!

Fast reactor starts clean nuclear energy era in Russia
Published time: June 27, 2014
A reactor is assembled in the normally occupied area of Unit BN-800 of the Beloyarsk Nuclear Power Station (BNPS) in Sverdlovsk Region (RIA Novosti / Pavel Lisitsyn)A reactor is assembled in the normally occupied area of Unit BN-800 of the Beloyarsk Nuclear Power Station (BNPS) in Sverdlovsk Region (RIA Novosti / Pavel Lisitsyn)

Controlled nuclear fission has been started in Russia’s newest fast breeder reactor in the Urals, heralding a closed nuclear fuel cycle and a future without nuclear waste. Russia is the only country that operates fast neutron reactors industrially.

The next generation BN-800 breeder reactor (880 megawatts) assembled at Russia’s Beloyarskaya nuclear power plant has been put in the so-called critical state on Friday, a week after all necessary nuclear fuel was loaded into the active zone.

The press service of Rosenergoatom, the electric energy generation branch of Russia’s nuclear monopoly, Rosatom, has confirmed to the RIA news agency that nuclear reaction in the BN-800 reactor has been initiated.

“Starting from that moment the reactor started to ‘live’,” RIA said, quoting the source in Rosenergoatom.

This means that controlled nuclear fission in the reactor is self-sustaining and ongoing at a constant speed. Once this most important stage of the start-up work is done, the reactor will be gradually prepared to achieve the desired 880 megawatts output expected to be reached in October, when the reactor will be commissioned for industrial use.

The BN-800 uses liquid metal sodium (Na) as a coolant heat transfer agent. The start of commercial operation of the new reactor is planned for early 2015.

A reactor is assembled in the normally occupied area of Unit BN-800 of the Beloyarsk Nuclear Power Station (BNPS) in Sverdlovsk Region (RIA Novosti / Pavel Lisitsyn)A reactor is assembled in the normally occupied area of Unit BN-800 of the Beloyarsk Nuclear Power Station (BNPS) in Sverdlovsk Region (RIA Novosti / Pavel Lisitsyn)

Service life of the BN-800 breeder reactor is expected to be 45 years. Every month it will produce 475 million kilowatt hours of electricity, enough to ensure constant supply to 3.15 million families (considering that the average monthly consumption of a family of three is 150 kilowatt hours).

Beloyarskaya nuclear power plant is situated in Zarechny, some 45 kilometers from the regional center of Yekaterinburg, in the Urals region.

The fast-neutron nuclear reactors use so-called breeder reactor technology that enables the use of a wider range of radioactive elements as fuel, thus considerably enlarging the potential stock of nuclear fuel for electricity generation.
Fast fission reactors close the question of potentially ending uranium nuclear fuel as they could ‘burn’ even nuclear waste.

Assembling a reactor in the ‘clean area’ of the BN-800 power unit at the Beloyarskaya NPP (RIA Novosti / Pavel Lisitsyn)Assembling a reactor in the ‘clean area’ of the BN-800 power unit at the Beloyarskaya NPP (RIA Novosti / Pavel Lisitsyn)

Besides producing electric energy, it generates more fissile material that can be used as nuclear fuel. This brings us to the closed nuclear fuel cycle, a long-lasting dream of the nuclear energy industry that appears to have come true.
Unlike ‘traditional’ nuclear reactors that use assemblies of uranium-235 as the principal fuel, breeder reactors use specially designed MOX (Mixed Oxide) fuel based on plutonium-239.

Russia’s nuclear monopoly, Rosatom, is finishing a plant in Krasnoyarsk region that will produce MOX fuel for the BN-800 reactor. The production line is assembled in a mine 200 meters underground. This will be operable by the end of 2014, and, starting from 2016, it will be running at full capacity.

Assembling a reactor in the ‘clean area’ of the BN-800 power unit at the Beloyarskaya NPP (RIA Novosti / Pavel Lisitsyn)Assembling a reactor in the ‘clean area’ of the BN-800 power unit at the Beloyarskaya NPP (RIA Novosti / Pavel Lisitsyn)

Russia has unique experience of operating fast reactors, although the first one, CLEMENTINE, was constructed in the US in 1946 at Los Alamos National Laboratory.

Over the decades, the USSR, then Russia, introduced a number of industrial and research fast neutron reactors. One of them, the BN-600 (600 megawatt), since 1980 running at the same Beloyarskaya nuclear power plant, is the only fast neutron reactor in the world that generates electricity on industrial scales. The BN-600 is also the most powerful operable fast neutron reactor in the world.

After decades of research, practically all breeder reactor projects around the world, including in the US, France, Japan and several other countries possessing nuclear energy technologies are now closed down. The only country that currently possesses operating breeder reactor power generation is Russia.

Russian physicists have already elaborated the next step for the revolutionary technology: a BN-1200 breeder reactor that is set to be assembled at the same Beloyarskaya nuclear power plant by 2020.

Overall, eight BN-1200 breeder reactors are expected to be constructed by 2030, which means that Russia is the only nation that is entering a new era of nuclear energy power generation – a truly clean and ecologically secure closed nuclear fuel cycle.

King Island Wind Project Cancelled! We’ve got One Less Problem, Without You!

King Island Set Free from Turbine Tyranny: Hydro Tasmania Pulls Plug on Chinese Backed Wind Farm

King Island

In yet another sign that the Australian wind industry is on its last legs, Hydro Tasmania has pulled up stumps on its plans to spear 600 turbines into the heart of King Island – the jewel of Bass Strait.

In typical wind weasel fashion, Hydro Tasmania sought community “support” for 200 turbines – but that was just phase 1 – when in reality its end game was to lob 600 of the monsters over every last inch of the place.

The proposal had the full backing of the Peoples Republic of China – which saw King Island as a handy anchor for the 600 turbines it planned to supply to its partner (see our post here).

With Australia’s Large-Scale RET on the nose, Hydro Tasmania has announced that it has dropped the project altogether. Here’s an ABC report on Hydro Tasmania’s retreat.

Hydro Tasmania ditches $2b King Island wind farm project
ABC News
27 October 2014

Factors cited by Hydro Tasmania

  • Low $A pushing up costs of turbines and other components
  • Declining demand for power on national grid
  • Projected increase in on-island construction costs

State-owned power generator Hydro Tasmania has killed off a $2 billion wind farm planned for King Island because it says the project is not economically viable.

Hydro had planned to build a 600 megawatt wind farm on the island, with the power generated to be connected to the National Electricity Market via a high-voltage underwater cable across Bass Strait to Victoria.

The wind farm was expected to produce 2,400 gigawatt hours (GWh) of renewable energy for the national market, which is enough to supply around 240,000 homes.

Chief executive Steve Davy said changing economic conditions had seen the estimated capital costs for the wind farm alone increase by around $150 million.

“We have exhausted all avenues by which this concept could progress and now do not believe it appropriate to continue with the feasibility study,” he said.

“We will now focus our resources on further investigating the benefits and viability of a second inter-connector as outlined in the Tasmanian Government’s recent state budget.”

Tasmania’s Energy Minister Matthew Groom said Hydro had “done the right thing”.

“Hydro Tasmania has today made a commercial decision that they won’t be proceeding with the King Island Wind Farm proposal on the grounds that the proposal unfortunately has been found to be not economically viable,” he said.

Donald Graham from the No TasWind Farm Group said “Blind Freddy could see two years ago that the project would not be feasible”.

“Eighteen months ago they told us they needed to spend two years and many millions to do a feasibility study before they could determine if is was feasible,” he said.

“They have done virtually nothing for 12 months and have discovered the obvious answer.  And what did the island get out of it? Nothing other than a severely split community.”

RET uncertainty not a factor 

Hydro director Andrew Catchpole said it was disappointing that the project was abandoned.

“Of course it’s disappointing when a project or an idea doesn’t work out but this happens in business all the time you need to investigate the idea to a point to decide whether it’s viable,” he said.

Hydro Tasmania, Australia’s largest renewable energy company, had voiced concern about future projects because of uncertainty surrounding the country’s Renewable Energy Target (RET).

He said many renewable energy projects across the country would depend on the outcome of the RET negotiations at a federal level but insisted the board’s decision was driven by economics.

“Our investigations eventually found that TasWind was not viable even if the RET was maintained at the existing level,” Mr Davy said.

The company also cited factors such as the lower Australian dollar which was driving up the cost of building the turbines and a drop in demand from the National Electricity Market (NEM).

Federal MP for Braddon Brett Whiteley said the project “did not stack up”.

“It would certainly have boosted jobs on the island and given the local economy a shot in the arm during the construction phase,” he said.

“The Government is committed to supporting a sustainable renewable energy sector with an amended RET that will ensure long-term certainty for the renewables sector so it can continue to contribute to Australia’s diverse energy mix.”

Residents divided on wind farm proposal 

The project had divided residents of King Island, with many strongly opposed to its development.

The 200-turbine wind farm was facing a legal challenge by the No Tas Wind Farm group who argued it did not have enough community backing.

Hydro said the project would not proceed to a feasibility study if the island’s residents did not support it.

A survey taken in mid-2013 found almost 59 per cent of the community wanted the project to proceed.

The wind farm was expected to employ up to 60 workers on King Island if it went ahead.

Mr Davy thanked King Island residents for their input in the process and said Hydro Tasmania would continue to support the island.

“We recognise that the TasWind project has created significant community debate on the island over the past two years,” he said.

“We also recognise that today’s announcement will be received with mixed emotions.”

Mr Whiteley said he hoped the island could move on quickly.

“Although the proposed King Island wind project was not universally supported by the local community, I know some will be disappointed by this announcement,” he said.

“It is hugely disappointing that the process has caused so much division in what has always been a very close knit community.”
ABC News

STT followers will remember Hydro Tasmania as the bunch of liars and thugs that rode roughshod over the close-knit community of King Island in an effort to pepper giant fans all over the jewel of Bass Strait.

In the first round, Hydro Tasmania promised King Island locals that unless 60% supported their planned project, they would simply abandon it – by dropping their planned “feasibility study” (see our posts here andhere). Hydro Tasmania then set about buying the votes it needed to show 60% supporting its project (see our post here).

Those shovelling Hydro Tasmania’s cash out to bribe the locals must have flunked basic arithmetic, because they only managed to muster 58.7% of the vote. But, never mind, Hydro Tasmania simply decided to ignore its earlier promise and launched into its feasibility study, anyway (see our post here). So much for keeping promises.

But, as they say: “what goes around, comes around”.

While the ABC reports Hydro Tasmania citing 3 factors that led to retreat, STT thinks they might have overlooked the 10s of $millions that Hydro Tasmania has already lost (and the 100s of $millions it will lose) on their existing Tasmanian wind farm operations – placing risky bets on the price of Renewable Energy Certificates (see our post here).

And, in the irony of ironies, it’s blaming the Federal Government’s RET Review and the threat that the Government will breach its “promise” to retain the mandatory Renewable Energy Target for those losses.

All that self-inflicted financial grief couldn’t be happening to a nicer bunch of lads.

Now that the threat of turbine terror has finally passed, King Islanders can celebrate a fabulous victory.

research team

Windweasels Attack Another Community….Residents in Fighting Mode….

Jupiter Wind Farm Proponents from Another Planet

rocket atlas-5-launches-tdrs-l-liftoff-1

Yet another wind farm disaster proposed for the Southern Tablelands, yet another community backlash. This time it’s the threatened Jupiter wind farm at Tarago that has sent locals into orbit: the community is nothing short of ropeable (see our posts here and here).

Here’s one of their number smashing the Spanish developer, the disgraceful NSW Planning Department and the hypocritical ACT government.

LETTER: They are on another planet
Greg Faulkner
Goulburn Post
15 October 2014

I AM writing regarding Jupiter wind farm, proposed for the area surrounding Tarago. The proposed development would consist of up to 110 wind turbines each 170 meters or 50 stories tall.

The developer is EPYC a company which I understand is over 80 per cent Spanish owned.

My partner and I are long term residents from within the project area.

Like most locals we live here for the peace and quiet. We now face the sickening possibility of our home being sandwiched between banks of these colossal turbines, situated on our neighbours land, and possibly as close as 600 meters from our house door.

After having contacted NSW Dept of Planning about the situation, and having received no helpful response, we find ourselves with no alternative but to speak out publicly against the frightening unfairness surrounding the current approach to wind farm development in The Southern Highlands.

The turbines proposed are mind boggling huge, this cannot be overstated.

They are taller than the Sydney Harbour Bridge and very nearly as tall as Canberra’s Black Mountain Tower.

247586460-14114959

They are bigger than the ones around Bungendore and, for close residents, will never be obscured by tree plantings or anything else. Giant turbines may be a novelty to marvel at for a few moments, as we drive past, but I don’t think many Australians would want to live in their midst 24/7. I have observed the use of the term NIMBY in the media, in relation to rural residents who express any doubt about wind farm development near their homes.

The most enthusiastic users of this brutal and provocative term seem to be “green” city residents, who may be comfortable in the knowledge that their communities will never be the target of wind farm development. It seems common sense that any person who learns that their beloved home may soon be surrounded by giant turbines will be understandably devastated, and should not be subjected to cheap name calling.

A little understanding would be more productive.

Like most working, middle aged Australians, our home represents virtually all of our capital and its sale was to be central to any type of retirement or health care in our old age (not so far away).

If Jupiter wind farm proceeds our house will be sandwiched between arrays of monstrous, spinning, noise emitting turbines.

I do not think I am being pessimistic when I predict that any sale will difficult, unless the price is very, very low indeed.

In this sense alone the development is an absolute disaster for us, and most of our neighbours are in the same boat.

Australia may want renewable power options but we cannot continue forward like this.

In its haste to establish the renewable power sector it seems the NSW Government is prepared to sacrifice the wellbeing of many rural residents in the Southern Highlands, so as to provide a financially appealing environment to tempt foreign investors. It has offered up the unregulated development of the Southern Highlands to foreign developers without bothering to provide any protection for existing residents.

Claims by developers that large turbine arrays don’t affect the value or amenity of a location are ludicrous and dishonest. It seems the ACT Government is also prepared to overlook the frightening unfairness of the various wind farm developments just outside its borders, in order to buy the power produced and achieve its renewable power ambitions.

The residents of Canberra may not be aware that these arrangements will come at a very high price for many families in neighbouring rural communities.

The ACT’s position is staggeringly hypocritical, given its long standing commitment to stringent height limits in its own planning law, which protect its own skyline from unsightly high rise development.

It is clear that the ACT government understands the importance of controlling development to ensure a healthy and unoffensive environment for its own residents.

It is also clear that this concern does not extend to nearby NSW neighbours who are being targeted for wind farm development that Canberra would never tolerate itself.
GREG FAULKNER, Boro Rd via Braidwood.
Goulburn Post

At a mere 600m from the nearest turbine, the Faulkner’s currently peaceful home will be turned into a sonic torture trap and will be totally uninhabitable.

That’s around the same distance that Pac Hydro lobbed its giant fans from long-suffering Sonia Trist’s Cape Bridgewater home. After years of suffering from incessant turbine generated low-frequency noise and infrasound, Sonia has decided enough is enough and is abandoning her beautiful and – once tranquil – home (see our post here).

But not to worry, the Spanish outfit aiming to destroy the Faulkner’s property and ability to enjoy it will employ a little of the $millions it’ll receive in REC subsidy to buy the house, stitch up the owners with a bullet-proof gag clause (see our posts here and here) and then quietly bulldoze it (see our post here).

bulldozer-home

Saul Alinski’s Rules for Radicals, and the Path to Communism….FIGHT AGENDA 21

SAUL ALINSKY’S
RULES FOR RADICALS

(or understanding current Democratic tactics)

Rule 1: Power is not only what you have, but what the enemy thinks you have

Rule 2: Never go outside the experience of your people.

Rule 3: Whenever possible, go outside the experience of the enemy.

Rule 4: Make the enemy live up to its own book of rules.

Rule 5: Ridicule is man’s most potent weapon

Rule 6: A good tactic is one your people enjoy.

Rule 7: A tactic that drags on for too long becomes a drag.

Rule 8: Use different tactics and actions and use all events of the period.

Rule 9: The threat is more terrifying than the thing itself.

Rule 10: Maintain a constant pressure upon the opposition.

Rule 11: If you push a negative hard and deep enough, it will break through into its counterside.

Rule 12: The price of a successful attack is a constructive alternative.

Rule 13: Pick the target, freeze it, personalize it, polarize it.

COMMUNIST MANIFESTO 10 PLANKS

10 Conditions For Transition To Communism

  1. Abolition of property in land and application of all rents of land to public purposes.
  2. A heavy progressive or graduated income tax.
  3. Abolition of all right of inheritance.
  4. Confiscation of the property of all emigrants and rebels.
  5. Centralisation of credit in the hands of the State, by means of a national bank with State capital and an exclusive monopoly.
  6. Centralisation of the means of communication and transport in the hands of the State.
  7. Extension of factories and instruments of production owned by the State; the bringing into cultivation of waste-lands, and the improvement of the soil generally in accordance with a common plan.
  8. Equal liability of all to labour. Establishment of industrial armies, especially for agriculture.
  9. Combination of agriculture with manufacturing industries; gradual abolition of the distinction between town and country, by a more equitable distribution of the population over the country.
  10. Free education for all children in public schools. Abolition of children’s factory labour in its present form. Combination of education with industrial production.

NAPAW Discusses Low Frequency Noise Testing, & it’s Implications for Wind Industry!

NAPAW: WILL ILFN BE THE “SILENT” INDUSTRY DESTROYER? PLYMPTON WYOMING BYLAW UPDATE

Dear friends,

Please find attached a media release that we would appreciate having wide circulation.

pdf file : media release v 4 plympton wyoming

Word Document file:  media release v 4 plympton wyoming

MEDIA RELEASE

October 16, 2014

BOOKEND HEALTH ISSUES TURBINES: Existing project in Glenmore WI (Brown County) formally declares its Duke’s “Shirley Wind” project a “health hazard”, and Mayor Lonny Napper and council in Plympton Wyoming, Ontario, anticipating several projects, create a revolutionary bylaw that includes ILFN (Infra and Low Frequency Noise) penalties

By Sherri Lange

Plympton Wyoming, Ontario, Mayor Lonny Napper is astonished. “With all the available evidence from around the world about the effects of Low Frequency and Infrasound from industrial wind turbines, it amazes me that the alarms are not sounding earlier and stronger.”

With about 1,000 acres of prime land under lease for turbine development, signed up between willing hosts and developers, this council is fighting to protect its citizens’ health. A new bylaw signed and completed third reading, October 8th, 2014, sets a new and interesting precedent by mentioning and effecting fines for health impairing ILFN. ILFN is well known to be an industrial plague, now exacerbated by industrial wind turbines that plague every corner of the globe, without, as is now acknowledged widely, producing viable, reliable or “green,” energy.

In Glenmore WI, the Health Department in Brown County, almost simultaneously with the efforts of the Mayor of Plympton Wyoming and CAO, Kyle Pratt, and council, declares that the Shirley Wind Project, containing some of the largest turbines in the US, is already the site of an industrial human health hazard.

“On Monday night, the Brown County Board of Health in Wisconsin voted to declare the Shirley Wind Project to be a human health hazard.  The approved motion states:

“To declare the Industrial Wind Turbines at Shirley Wind Project in the Town of Glenmore, Brown County, WI. A Human Health Hazard for all people (residents, workers, visitors, and sensitive passersby) who are exposed to Infrasound/Low Frequency Noise and other emissions potentially harmful to human health.””

While the State of Wisconsin controls siting of industrial wind, it cannot override or subjugate the “public health hazard” declaration and initiatives. A health hazard, in most jurisdictions, is a condition of high alert, where acute or chronic illness, or death, may occur due to prolonged exposure. The hazard must be reported, and in some areas,mandated abatement must take place.

Mayor Lonny Napper seems to be of the same mind, noting that the Green Energy and Green Economy Act has taken away much democratic decision-making: his council’s bylaw aims to ensure people in his jurisdiction will be protected from turbine related ILFN and the effects that are recorded, sadly, worldwide.

Common effects are from chronic unrelenting noise, sleep disorders, hormone level disruption, increased risk of disease, diabetes, hypertension, depression, heart arrhythmias, and possibly even cancer. (Carmen Krogh and Dr Robert McMurtry recently published a case definition that accepts inner ear disruption, sleep disorders, hypertension, mood disorders, nausea, tinnitus, as part of the presenting complaints combined with proximity to wind turbines.)

“When I took an oath to protect my community, I took it very seriously,” continues Mayor Napper. “The information about what other communities are suffering, disruption, noise, degradation of precious landscapes, seriously divided communities, and to see that this possible devastation is in my full view, for my residents, something has to give.”

Mayor Napper does not understand the delay for protective measures. “People are suffering in other projects. My community is slated for multiple developers and several proposed wind projects. The time for action, and protective measures, has been with us for some time now….we can’t continue to bounce around the same arguments and with no noticeable gain in community health rights. The protection of health is first.”

Lange, of the North American Platform Against Wind Power (NA-PAW) agrees. “We have for some time now sounded the alarm for what amounts to a turbine factory health pandemic: similar effects are reported in communities worldwide. These “factories” operate without the sanction of communities. They operate without fire controls, without any regard for environmental practices, and they certainly override what is now common knowledge about noise: audible, shadow flicker, vibration and Low Frequency and Infrasound, and related air pressure fluctuations, which in combination or separately, are known to extract “torture” on unwilling people/communities.”

Both Mayor Napper and Mr. Pratt, CAO, agree that individual communities need to understand that they can use bylaw powers to protect health as required. “If Ontario communities are having so little jurisdiction to control development of massive electrical producing facilities within their boundaries, the least the council can do is to mediate the devastating health effects already reported and well known to exist, that many feel are sure to happen here.” Mr. Pratt says that he hopes the bylaw will be an example to other councils. Pratt adds, “The Town of Plympton-Wyoming Council has worked hard to protect our residents, and make sure that developers are required to deal with issues and appropriately respond to complaints and requirements from council.”

Adds Lange, “The known effects of infrasound and low frequency noise may well turn out to be the death sentence for a non-performing, entirely subsidy driven, outrage.”

Even the MOE (Ministry of Environment Ontario) admits in 2009 the complex nature of sounds and pressures:

“I went out last night for about 5 hours (got home midnight) and got some real firsthand experience with different types of noise that the turbines can create. The same turbine or groups of turbines could create 3-4 different types of noise and at different magnitudes at different times in the evening all depending on meteorological conditions, time of day, their orientation, and how they readjusted themselves (auto or by manual control – we don’t know) to wind speed and direction. Also I was able to experience firsthand wind shear conditions (no wind at ground but turbines still generating creating noise) and how that plays an important role in noise impacts.”  —Oct. 29, 2009, Bill Bardswick, Director West Central Region, Ontario Ministry of Environment

ORDER TO STAND DOWN

“Ok, message received and understood. Cam [Cameron Hall] and I will  stand down until directed otherwise.”  —Mar. 8, 2010, Gary Tomlinson, Provincial Officer, Senior Environmental Officer, Guelph District Office, West Central Region, Ontario Ministry of the Environment

For more information please contact:

Mayor Lonny Napper

Town of Plympton-Wyoming

546 Niagara Street, P.O. Box 250

Wyoming, Ontario N0N 1T0

Phone: 1 226 307 0523

Napper1@cogeco.on.ca

Kyle Pratt MPA, CMM III, CHRP, CMO

Chief Administrative Officer

Town of Plympton-Wyoming

546 Niagara Street, P.O. Box 250

Wyoming, Ontario N0N 1T0

Phone: 519-845-3939

Toll Free (Ontario): 1-877-313-3939

kpratt@plympton-wyoming.ca

Sherri Lange

CEO NA-PAW (North American Platform Against Wind Power)

kodaisl@rogers.com

416 567 5115

REFERENCES

http://stopthesethings.com/2014/10/13/world-first-ontario-council-includes-infrasound-in-wind-farm-noise-law/

http://www.obwf.ca/industrial-wind-turbines-declared-a-human-health-hazard/

http://waubrafoundation.org.au/resources/video-shirley-wind-project-wisconsin-usa/

http://waubrafoundation.org.au/resources/brown-county-ordinance-chapter-38-public-health-nuisance/

http://www.na-paw.org/pr-121207.php

http://waubrafoundation.org.au/resources/definitive-document-wind-turbine-noise-simple-statement-facts-august-2014/

http://waubrafoundation.org.au/resources/definitive-document-wind-turbine-noise-simple-statement-facts-august-2014/

http://www.thecrimson.com/article/2010/9/10/wind-energy-power-farms/

http://stopthesethings.com/2014/10/16/board-of-health-declares-wisconsin-wind-farm-a-human-health-hazard/

http://stopthesethings.com/2014/02/14/dr-mariana-alves-pereira-how-to-test-for-the-effects-of-low-frequency-turbine-noise/

file:///C:/Users/Home/Downloads/JRSM_Open-2014-McMurtry-.pdf

Obama’s Heavy-handed Regulatory Policies, Will Mean the Destruction of the American Economy!!

Paul Driessen on political developments and the highjacking of the American government

Well lets just be a little old fashioned and assume that the American Experiment in Government was designed by wise men who had studied the human reality and decided to form a union based on the best of principles of self government.

Then imagine that intrusive ideologies arose that would corrupt and then destroy those best of principles.

Paul Driessen speaks to some of those concerns.

President Obama and many Democrats have excoriated companies for utilizing “tax inversions” to repatriate stockpiles of cash from overseas bank accounts, thereby avoiding the 35% US corporate tax rate and providing new funds for plants and equipment, innovation, hiring and keeping workers, and tapping new markets. Calling this “unpatriotic” and “immoral” is just another false, distracting, divisive community agitator tactic.

What America really needs right now is regulatory patriotism – and Executive Branch morality, citizenship, and fealty to our Constitution and laws. What we’re stuck with is a destructive, unpatriotic regulatory onslaught. The bare tip of the iceberg is that confiscatory 35% corporate tax rate, which is embedded in a Tax Code that is 74,000 pages and 33 million words long – 42 times more words than in the King James Bible.

As President Obama said recently, “Make no mistake, [my] policies are on the ballot, every single one of them.” He’s absolutely right. Will American voters remember that when they head to the polls in November?

Thank you for posting my article, quoting from it, and forwarding it to your friends and colleagues.

Best regards,

Paul

We need some regulatory patriotism!

President Obama condemns tax inversions, but pillages America with his regulatory agenda

“My policies are on the ballot, every single one of them,” he reminded voters on October 2.

Paul Driessen

It’s no mystery why American companies have stockpiled over $2 trillion of overseas earnings in foreign bank accounts. If they bring it to the United States, the IRS would grab 35% of it. That’s the US corporate tax rate – the highest in the developed world, double the average in EU nations.

Medtronic found a creative way to repatriate its cash, allowing it to bring money to the USA subject to just a 12.5% tax. The company acquired Covidien, another, smaller medical device firm in Ireland and will establish its formal headquarters in Dublin, thereby slashing its tax rate by two-thirds, and leaving it with far more cash for plants and equipment, innovation, hiring and keeping workers, and tapping new markets.

Pharmaceutical, biotechnology, healthcare and other companies have concluded or are pursuing similar “tax inversion” strategies. The actions have outraged the White House, “progressive” activists and many Democrats in Congress – except when President Obama’s BFF Warren Buffett engineered Burger King’s acquisition of Canada’s Tim Horton café and bakery chain.

The President says the practice is “unpatriotic” and “immoral,” calls the companies “corporate deserters,” and says businesses must start acting like “good corporate citizens.” Congressional Democrats have issued similar denunciations and want inversions prohibited or punished. They’re barking up the wrong tree.

The proper solution is comprehensive tax reform. However, Republicans want to address both corporate and individual tax issues, Democrats insist that only corporate taxes on the table, and Mr. Obama is typically not inclined to do the hard work of forging bipartisan compromises. Instead, he wants his IRS and Treasury Department to review “a broad range of authorities for possible administrative actions” and ways to “meaningfully reduce the tax benefits after inversions take place,” as one Treasury official put it.

Companies, workers and investors are bracing for the coming executive fiats. The diktats epitomize a huge problem that neither Congress nor the courts have been willing to address, but which continues to drag our nation’s economy and employment into the abyss: an out-of-control federal bureaucracy that is determined to control virtually every aspect of our business and personal lives – at great cost, for few benefits, and with little or no accountability for mistakes or even deliberate harm.

Of course we need taxes, laws and regulations, to set norms and guidelines, safeguard society, punish miscreants and pay for essential government programs. No one contests that. The question is, How much?

What we need right now is regulatory patriotism – and Executive Branch morality, citizenship, and fealty to our Constitution and laws. The federal behemoth today is destructive, and unpatriotic.

* The confiscatory 35% corporate tax rate is embedded in a Tax Code that’s 74,000 pages long, counting important cases and interpretations. It totals some 33 million words (compared to 788,280 in the King James Bible) and is loaded with crony corporatist provisions and complex, indecipherable language.

* A 906-page, 418,779-word (un)Affordable Care Act that has already metastasized into more than 10,000 pages of complex, often contradictory regulations, with more interpretations and clarifications to come.

* The 2,300-page Dodd-Frank law has already spawned over 14,000 pages of banking and financial rules.

* Over 175,000 pages in the Code of Federal Regulations are coupled with more than 1.4 million pages of tiny-type Federal Register proposed and final rules published just since 1993, at the rate of over 71,000 pages per year. Doctors, patients, insurers, businesses large and small – much less average citizens – cannot possibly read, comprehend or follow this onslaught.

* At least 4,450 federal crimes are embedded in those laws and regulations (with some 500 new crimes added per decade) – often for minor infractions like failing to complete or file precisely correct paperwork for selling orchids or importing wood for guitars. Neither inability to understand complex edicts, lack of knowledge that they could possibly exist, nor absence of intent to violate them is a defense, and the “crime” can bring military swat teams through doors, and land “violators” in prison for months or years.

* Production Tax Credits and other sweetheart “green” energy subsidies and grants total some $40 billion a year – for ethanol producers and folks like Tesla CEO Elon Musk and Mr. Tom Kiernan, who is both CEO of the American Wind Energy Association and treasurer of the League of Conservation Voters, which gives millions to mostly Democratic candidates to perpetuate the arrangements.

* American businesses and families must pay $1.9 trillion per year to comply with these mountains of regulations. That’s one-eighth of the nation’s Gross Domestic Product; it’s almost all the corporate money now held overseas: $5,937 a year for every American citizen – and far more than the $1.6 trillion in direct economic losses that re-insurer Munich Re blames on weather-related disasters between 1980 and 2011.

* $353 billion of these regulatory costs are inflicted by the Environmental Protection Agency alone, say Competitive Enterprise Institute experts who prepared the $1.9 trillion regulatory costs analysis for 2013.

Even worse, these criminal complexities and costs are being imposed by increasingly ideological, left-of-center, anti-business “public servants” who target conservatives and are intent on advancing President Obama’s agenda of “fundamentally transforming” the United States. They are determined to redistribute wealth, pit economic and ethnic groups against each other, close down coal-fired power plants, ensure that electricity prices “necessarily skyrocketing,” and stop drilling, mining, ranching, fracking and pipelines.

Poll after poll finds Americans focused on jobs and the economy, and on ISIL, terrorism and Ebola. Not so our federal government. Secretary of State John Kerry says climate change is “the world’s most fearsome weapon of mass destruction,” posing “greater long-term consequences” than terrorism or Ebola. For EPA the biggest issues are global warming, “environmental justice” and “sustainable development.”

How is the US economy responding to these policies? Median household income is down $2,000 since Obama took office, while costs of living continue to rise. Despite the subsidies, electricity prices have soared 14-33% in states with the most wind power. Some 45 million Americans now live below the poverty line – a 50% increase over the 30 million in poverty on inauguration day 2009.

While the official unemployment rate is now under 6% for the first time in six years, University of Maryland economist Peter Morici puts the real jobless rate at closer to 20% – which includes the millions who have given up looking for work, those who want to work full-time but must settle for part-time, and students enrolled in graduate school because their employment prospects are so bleak.

The labor force participation rate now stands at 62.7 percent, the lowest level in 36 years, with over 92 million adults not working. Over the past six years, one million more Americans have dropped out of the labor force than have found a job.

Indeed, a hallmark of the Obama recovery is its unique ability to convert three full-time jobs with benefits into four part-time positions with no benefits – and then say unemployment is declining.

It’s hardly surprising that dozens of senators and congressmen who voted with Mr. Obama 90-99% of the time now want to be seen as “moderate independents” – and do not want to be seen with the President.

But as President Obama told Northwestern University students October 2, “Make no mistake, [my] policies are on the ballot, every single one of them.”

He’s absolutely right. So are his economic and employment records. Time will tell how many people remember that when they vote November 4.

_________

Paul Driessen is senior policy analyst for the Committee For A Constructive Tomorrow (CFACT) and Congress of Racial Equality (CORE), and author of Eco-Imperialism: Green power – Black death.